2023 Cases with Industry Code "EL" ELECTRIC (492 cases)

Case NumberCase TitleOpen DateClosed Date
23-0004-EL-GAGCenter Township- Carroll County01/03/2023 
23-0006-EL-GAGCenter Township- Carroll County01/03/2023 
23-0011-EL-BNRBeatty-Canal Street 138 kV Transmission Line Re-Termination (White Road) Project01/31/2023 
23-0012-EL-BNRFlatlick 765 kV Station Expansion Project01/18/2023 
23-0016-EL-BNRDuke Energy Ohio, Inc.01/13/2023 
23-0017-EL-BNRBroadview-Tangy 138 KV Transmission Line Loop to Finley Substation03/15/2023 
23-0020-EL-AISIn the Matter of the Application of American Transmission Systems, Incorporated for Authority to Issue, Sell, or Enter into Debt Transactions01/10/2023 
23-0023-EL-SSOIn the Matter of the Application of Ohio Power Company for Authority to Establish a Standard Service Offer01/06/2023 
23-0024-EL-AAMIn the Matter of the Application of Ohio Power Company for Approval of Certain Accounting Authority01/06/2023 
23-0025-EL-CSSDARYL L. LOGAN SR. VS AES OHIO 01/10/202305/08/2023
23-0026-EL-RDRIn the Matter of the Application of Duke Energy Ohio, Inc., to Adjust and Set Rider ESRR01/31/2023 
23-0027-EL-PEBDuke Energy Ohio, Inc.08/21/202303/12/2024
23-0028-EL-BLNGreen Chapel Station Project01/10/2023 
23-0030-EL-BNRWestfall – South Central Power 138kV Tie Line Project01/12/2023 
23-0033-EL-GAGCity of Delaware02/02/2023 
23-0035-EL-AGGABLE POWER MANAGEMENT, LLC01/11/2023 
23-0040-EL-BLNShannon-Astor 138 kV Transmission Line Project01/17/2023 
23-0042-EL-BNROhio Power Company - Adkins Station Expansion Project03/09/2023 
23-0043-EL-PEB38077 US Hwy 36 Warsaw, Petition for Reallocation of Electric Certified Territory01/12/202306/07/2023
23-0044-EL-PEB37541 US Hwy 36 Warsaw, Petition for Reallocation of Electric Certified Territory01/12/202306/07/2023
23-0045-EL-BGNIn the Matter of the Application of Clear Mountain Energy Center, LLC01/12/2023 
23-0047-EL-BGAFourth Amendment Application of Guernsey Power Station LLC01/18/2023 
23-0048-EL-AGGEnergy Zebra LLC01/13/2023 
23-0049-EL-ATADuke Energy Ohio, Inc.01/13/2023 
23-0051-EL-RDROhio Edison Company, The Cleveland Electric Illuminating, The Toledo Edison Company01/13/2023 
23-0054-EL-ATADuke Energy Ohio, Inc.01/31/2023 
23-0055-EL-GAGLanier Township- Preble County 01/17/2023 
23-0057-EL-RDRApplication of Ohio Power Company to Update Its Basic Transmission Cost Rider. 01/17/2023 
23-0059-EL-RDRIn the Matter of the Application of Duke Energy Ohio, Inc., for the Annual Audit of Rider SCR, Rider RE, Rider RC, and Rider ECF.01/31/2023 
23-0064-EL-BNRHarding-Jennings 138 kV Transmission Line Structure Replacement01/27/2023 
23-0066-EL-BLNMadison to Fayette 345kV Transmission Line Project (AES Ohio)02/07/2023 
23-0067-EL-BLNFayette Substation and 138kV Extension Project (AES Ohio)06/08/2023 
23-0068-EL-GAGMiami County Commissioners01/19/2023 
23-0072-EL-AGGRenodis ER LLC01/19/2023 
23-0073-EL-BLNDuke Energy Ohio, Inc.03/09/2023 
23-0076-EL-BNRConesville - Slate 138 kV Transmission Line Project01/24/2023 
23-0081-EL-GAGWaynesville Village-Warren County 01/24/2023 
23-0084-EL-ATAIn the Matter of the Application of Ohio Power Company for Authority to New or Amended Rate Schedules and Tariffs 01/26/2023 
23-0086-EL-BLNNotice of Self-Certification of Exempt Wholesale Generator Status01/27/202308/15/2023
23-0089-EL-RDRIn the Matter of the Review of Duke Energy Ohio, Inc.'s Alternative Energy Recovery Rider01/27/2023 
23-0090-EL-ACPMarket Monitoring Report01/26/2023 
23-0092-EL-RDRIn the Matter of the Application of Ohio Power Company to Update Its Smart City Rider. 01/27/2023 
23-0094-EL-BNRDuke Energy Ohio, Inc.02/10/2023 
23-0095-EL-GAGHarveysburg Village- Warren County 01/30/2023 
23-0098-EL-GAGMassie Township- Warren County 01/30/2023 
23-0099-EL-BNRMarysville-Cadence Solar 345 kV Transmission Line11/06/2023 
23-0101-EL-RDRIn the Matter of the Application of Ohio Power Company to Adjust The Economic Development Cost Recovery Rider Rate. 01/31/2023 
23-0103-EL-ACPRenewable Portfolio Standard Report to the General Assembly for the 2021 Compliance Year02/01/2023 
23-0104-EL-BLNIn the Matter of the Letter of Notification Application for the Blossom Solar 138 kV Gen-Tie Transmission Line Project04/06/2023 
23-0105-EL-AECIn the Matter of the Joint Application of Amazon Data Services, Inc. and Ohio Power Company for Approval of an Economic Development Arrangement for Oh02/02/2023 
23-0106-EL-RDRIN THE MATTER OF THE REVIEW OF THE DISTRIBUTION INVESTMENT RIDER CONTAINED IN THE TARIFF OF OHIO POWER COMPANY03/08/2023 
23-0112-EL-CSSRAYMOND ACOSTA VS IDT ENERGY02/07/202302/08/2024
23-0113-EL-UNCDuke Energy Ohio, Inc. Significantly Excessive Earnings Test 202305/11/2023 
23-0115-EL-CSSTyler Slack vs NRG02/07/202308/15/2023
23-0117-EL-GAGVillage of Hamler02/08/2023 
23-0118-EL-ABNAmerican Electric Power (Ohio Power Company)02/10/2023 
23-0122-EL-BNRFiddlestix Switch & Poston Ross 138-kV Cut-In Project02/13/2023 
23-0123-EL-BLNFiddlestix Switch-Ilesboro South Central Power 138-kV Transmission Line Project02/13/2023 
23-0125-EL-RDRIn the Matter of the Application of Duke Energy Ohio, Inc., for Approval to Adjust Rider DDR02/27/2023 
23-0126-EL-RDRIn the Matter of the Application of Duke Energy Ohio, Inc., to Adjust and Set Rider DSR03/29/2023 
23-0127-EL-GAGLorain, Ohio02/13/2023 
23-0128-EL-ACPRESCOM ENERGY LLC04/14/2023 
23-0130-EL-RDRAES Ohio - Annual True-up Filing for its Transmission Cost Recovery Rider - Nonbypassable03/15/2023 
23-0134-EL-GAGLogan County02/15/2023 
23-0136-EL-ACPMesser Energy Services Inc.03/09/2023 
23-0140-EL-UNCIn the Matter of the Application of Ohio Edison Company, The Cleveland Electric Illuminating Company, and The Toledo Edison Company for Approval of a 02/16/2023 
23-0141-EL-BLNHolloway-Knox 138 kV Transmission Line Rebuild Project - Holloway Sub to Nottingham Sub Segment02/17/2023 
23-0145-EL-BGNIn the Matter of the Application of Prairie Flyer Energy Storage LLC for a Certificate of Environmental Compatibility and Public Need for an Energy St02/21/2023 
23-0146-EL-BGNScioto Ridge Solar LLC02/28/2023 
23-0147-EL-RDRIn the Matter of the Application of Duke Energy Ohio, Inc., for Authority to Adjust its Power Future Initiatives Rider05/17/2023 
23-0150-EL-CSSDaniel Joyingo vs Energy Harbor, LLC02/21/202302/08/2024
23-0151-EL-AISIn the Matter of the Application of The Dayton Power and Light Company d/b/a AES Ohio for Authority to Issue Certain Long-Term Debt02/22/2023 
23-0153-EL-BNRKileville-Shire 138 kV Tie Lines Project03/03/2023 
23-0159-EL-GAGVillage of Adena-Jefferson County02/23/2023 
23-0164-EL-ACPMC Squared Energy Services, LLC RPS Report for 202202/28/2023 
23-0167-EL-BNRNorth Intertie Station Expansion Project03/06/2023 
23-0169-EL-RDRIn the Matter of the Application of Ohio Power Company to Update Its Enhanced Service Reliability Rider. 03/01/2023 
23-0170-EL-RDRIn the Matter of the Application of Ohio Power Company to Update Its Pilot Throughout Balancing Adjustment Rider. 03/01/2023 
23-0178-EL-CSSANSLEY WAY LTD VS OHIO EDISON COMPANY 03/06/202302/08/2024
23-0180-EL-PEBDuke Energy Ohio, Inc.08/01/202303/12/2024
23-0181-EL-ACPDuke Energy Ohio, Inc. 2022 RPS Compliance04/12/2023 
23-0182-EL-RDRDayton Power and Light Company dba AES Ohio - Authority to Recover Certain Storm-Related Service Restoration Costs 04/03/2023 
23-0188-EL-BNRDuke Energy Ohio, Inc.04/27/2023 
23-0191-EL-GAGCity of Lorain, Ohio03/09/2023 
23-0197-EL-ACPSHIPLEY CHOICE LLC03/13/2023 
23-0203-EL-BNRLongview-Ontario 138 kV Transmission Line Switch Replacement Project03/17/2023 
23-0229-EL-ACPRPS Filing for Interstate Gas Supply LLC.03/16/2023 
23-0232-EL-ACPChoice Energy, LLC - 2022 RPS Compliance Filing03/16/2023 
23-0235-EL-ACPTitan Gas, LLC dba CleanSky Energy - RPS Compliance Report for 2022 Compliance Year03/21/2023 
23-0238-EL-ACPTomorrow Energy Corp RPS Compliance Filing Report04/07/2023 
23-0239-EL-CSSHugh Lee Dalton vs Titan Gas and Power d/b/a Clean Sky Energy03/17/202302/08/2024
23-0241-EL-BTAAmendment to the Ross-Ginger 138 kV Transmission Line04/14/2023 
23-0247-EL-CSSCHAY NORMENT VS OHIO EDISON / FIRST ENERGY 03/20/202302/08/2024
23-0250-EL-ACPRealgy, LLC03/21/2023 
23-0251-EL-RDRIn the Matter of the Review of Ohio Power Company's Alternative Energy Rider 03/23/2023 
23-0252-EL-ACPMajor Energy Electric Services, LLC RPS compliance filing04/03/2023 
23-0253-EL-ACPVerde Energy USA Ohio, LLC RPS compliance filing04/03/2023 
23-0256-EL-BLNColumbus Solar Park LLC Model Landfill Solar 138 kV Gen-Tie Transmission Line Project03/21/2023 
23-0260-EL-BLNKiser Substation Interconnection Project- AES Ohio05/25/2023 
23-0261-EL-AISOhio Power Company Application for Authority to Issue Long Term Debt03/22/2023 
23-0262-EL-AISOhio Power Company Application to Issue Short-Term Debt03/22/2023 
23-0263-EL-CSSDGK Hospitality, LLC VS AEP Energy03/22/202302/08/2024
23-0264-EL-ACPTexas Retail Energy 2022 Renewable Portfolio Standard Status Report03/22/2023 
23-0266-EL-ACPSmartestEnergy US, LLC 2022 OH RPS Compliance03/28/2023 
23-0269-EL-ACPVista Energy Marketing L.P. RPS 202203/24/2023 
23-0270-EL-CSSAlan Ladd vs Dynegy Energy Services East dba Brighten Energy03/24/2023 
23-0271-EL-ACPSFE Energy Ohio, Inc.’s Renewable Portfolio Standard (RPS) filing for 202203/27/2023 
23-0272-EL-ACPStateWise Energy Ohio LLC’s Renewable Portfolio Standard (RPS) filing for 202203/27/2023 
23-0274-EL-AGGEZ ENERGY SERVICES LLC 03/27/2023 
23-0276-EL-ACPFreepoint Energy Solutions LLC - Annual RPS Compliance04/04/2023 
23-0278-EL-GAGCity of Hilliard04/11/2023 
23-0279-EL-RDRThe Dayton Power and Light Company d/b/a AES Ohio04/17/2023 
23-0280-EL-ACPThe Dayton Power and Light Company d/b/a AES Ohio04/14/2023 
23-0281-EL-ATADuke Energy Ohio, Inc.03/29/2023 
23-0282-EL-RDRThe Dayton Power and Light Company d/b/a AES Ohio04/14/2023 
23-0284-EL-ACPIn the Matter of the 2022 RPS Compliance filing report for Josco Energy USA LLC03/29/2023 
23-0285-EL-ACPIn the Matter of the 2022 RPS Compliance filing report for Median Energy Corp03/29/2023 
23-0287-EL-ACPStar Energy Partners RPS 2022 Filing03/29/2023 
23-0289-EL-ACPMpower Energy NJ LLC RPS Report for 202203/30/2023 
23-0290-EL-BLNBadger Station Project06/14/2023 
23-0291-EL-ACPAmerican Power & Gas of Ohio, LLC RPS Annual Compliance Filing03/31/2023 
23-0292-EL-ACPIn the Matter of the Alternative Energy Portfolio Status Report for Calendar Year 2022 from Direct Energy Business, LLC04/11/2023 
23-0293-EL-ATAIn the Matter of the Application of Duke Energy Ohio, Inc. for Approval of Tariff Amendments03/31/2023 
23-0294-EL-ACPUtility Gas and Power03/31/2023 
23-0295-EL-ACPIn the Matter of the Alternative Energy Portfolio Status Report for Calendar Year 2022 from Direct Energy Services, LLC04/11/2023 
23-0296-EL-ACPIn the Matter of the Alternative Energy Portfolio Status Report for Calendar Year 2022 from XOOM Energy Ohio, LLC04/11/2023 
23-0297-EL-ACPIn the Matter of the Alternative Energy Portfolio Status Report for Calendar Year 2022 from Stream Ohio Gas & Electric, LLC04/10/2023 
23-0298-EL-ACPIn the Matter of the Alternative Energy Portfolio Status Report for Calendar Year 2022 from Reliant Energy Northeast LLC04/10/2023 
23-0299-EL-ACPIn the Matter of the Alternative Energy Portfolio Status Report for Calendar Year 2022 from Energy Plus Holdings LLC04/10/2023 
23-0300-EL-ACPDiamond Energy East, LLC Annual RPS Compliance Filing Report04/05/2023 
23-0301-EL-SSOIn the Matter of the Application of Ohio Edison Company, The Cleveland Electric Illuminating Company and The Toledo Edison Company for Authority to Pr04/05/2023 
23-0302-EL-ACPThink Energy, LLC 2022 RPS Compliance Filing Report04/12/2023 
23-0304-EL-ACPRenaissance Power & Gas 2022 RPS Report04/07/2023 
23-0305-EL-ACPCleanChoice Energy 2022 RPS Report04/13/2023 
23-0306-EL-BNROPSB Dimmick Substation08/15/2023 
23-0308-EL-BNROPSB Columbia and Davis Road Roundabout Relocation06/30/2023 
23-0322-EL-CSSSharon Daly v. CleanSky Energy04/04/2023 
23-0323-EL-ACPAlpha Gas and Electric, LLC 2022 OH RPS Compliance 04/12/2023 
23-0324-EL-ACPEcoPlus Power, LLC 2022 OH RPS Compliance 04/12/2023 
23-0325-EL-ACPProvision Power and Gas, LLC 2022 OH RPS Compliance 04/12/2023 
23-0326-EL-ACPGreenLight, Inc. 2022 OH RPS Compliance 04/12/2023 
23-0327-EL-ACPGrid Power Direct, LLC 2022 OH RPS Compliance 04/12/2023 
23-0328-EL-ACPInspire Energy Holdings, LLC 2022 OH RPS Compliance 04/12/2023 
23-0329-EL-ACPMega Energy of Ohio, LLC 2022 OH RPS Compliance 04/04/2023 
23-0330-EL-ACPPark Power, LLC 2022 OH RPS Compliance 04/12/2023 
23-0331-EL-ACPRPA Energy, Inc. 2022 OH RPS Compliance 04/12/2023 
23-0332-EL-ACPAtlantic Energy MD LLC 2022 RPS Compliance Report04/06/2023 
23-0333-EL-ACPRushmore Energy, LLC 2022 OH RPS Compliance 04/14/2023 
23-0334-EL-ACPSouth Bay Energy Corp. 2022 OH RPS Compliance 04/12/2023 
23-0335-EL-ACPNational Gas & Electric RPS Report for202204/04/2023 
23-0336-EL-ACPRPS Compliance Report of IDT Energy, Inc.04/04/2023 
23-0337-EL-ACPNational Gas & Electric RPS Report for 202204/04/2023 
23-0338-EL-ACPRPS Compliance Report of Residents Energy, LLC04/04/2023 
23-0339-EL-ACPRPS Compliance Report of Town Square Energy East, LLC04/04/2023 
23-0341-EL-ACPRPS Compliance Filing Report for nTherm, LLC04/14/2023 
23-0342-EL-ACPRPS Compliance Filing for Tenaska Power Management LLC04/13/2023 
23-0343-EL-BNRAnguin 138 kV Extension No. 1 Transmission Line Project04/12/2023 
23-0345-EL-RDROhio Edison Company, The Cleveland Electric Illuminating, The Toledo Edison Company04/13/2023 
23-0346-EL-BTXLincoln Park-Riverbend 138 kV Transmission Line Project II04/28/2023 
23-0347-EL-ACPIn the Matter of the Alternative Energy Portfolio Status Report for Calendar Year 2022 from Green Mountain Energy Company04/10/2023 
23-0348-EL-ACPIn the Matter of the Alternative Energy Portfolio Status Report for Calendar Year 2022 from Independence Energy Group LLC04/11/2023 
23-0349-EL-ACPIn the Matter of the Alternative Energy Portfolio Status Report for Calendar Year 2022 from Hudson Energy Services LLC04/13/2023 
23-0350-EL-ACPIn the Matter of the Alternative Energy Portfolio Status Report for Calendar Year 2022 from Just Energy Solutions Inc.04/13/2023 
23-0352-EL-ACPENGIE RESOURCES LLC04/11/2023 
23-0353-EL-ACPRPS Compliance Filing Report for All American Power and Gas OH, LLC, Calendar Year 2022.04/12/2023 
23-0354-EL-ACPRPS Compliance Filing Report for Pure Energy USA OH, LLC, Calendar Year 2022.04/13/2023 
23-0355-EL-BLNInnovation-Green Chapel 138 kV Transmission Line Project04/06/2023 
23-0356-EL-AGGMiami Valley Communications Council04/07/2023 
23-0357-EL-ACPIn the Matter of the Alternative Energy Portfolio Status Report for Calendar Year 2022 from Frontier Utilities Northeast LLC04/14/2023 
23-0358-EL-ACPIn the Matter of the Alternative Energy Portfolio Status Report for Calendar Year 2022 from NextEra Energy Services Ohio LLC04/14/2023 
23-0360-EL-ACPRPS Compliance Report for Energy Harbor LLC04/14/2023 
23-0361-EL-AGGInsuragy, LLC04/10/2023 
23-0363-EL-ACPLand O' Lakes RPS Report 202204/10/2023 
23-0364-EL-ACPArcher Energy 2022 RPS Report 04/10/2023 
23-0369-EL-ACPAggressive Energy 2022 RPS Report04/11/2023 
23-0371-EL-ACPNordic Energy Services LLC: CY 2022 RPS Filing04/11/2023 
23-0372-EL-ACPNew Wave Energy 2022 RPS Report04/11/2023 
23-0373-EL-BTXIn the Matter of the Application of South Branch Solar, LLC for a Certificate of Environmental Compatibility and Public Need for Generation Transmissi04/12/2023 
23-0375-EL-ACP23-040004/12/2023 
23-0376-EL-ACP23-034204/12/2023 
23-0377-EL-ACPEligo Energy Annual RPS Compliance Filing Report for the 2022 Compliance Year04/14/2023 
23-0378-EL-FORIn the Matter of the Long-Term Forecast Report of AMP Transmission, LLC and Related Matters04/12/2023 
23-0379-EL-ACPGreat American Power RPS Compliance Filing Report04/14/2023 
23-0380-EL-ACPWGL Energy RPS Report for 202204/17/2023 
23-0382-EL-ACPWGL Energy Annual RPS Compliance Filing Report for the 2022 Compliance Year04/12/2023 
23-0383-EL-CSSCHAMPION CAMPING CLUB VS DUKE ENERGY OHIO, INC.04/12/202302/08/2024
23-0384-EL-ACPHolcim (US) Inc. RPS Report 202204/12/2023 
23-0385-EL-ACPAstral Energy Annual RPS Compliance Filing Report for the 2022 Compliance Year04/12/2023 
23-0387-EL-ACP2022 RPS Compliance for Calpine Energy Solutions, LLC04/12/2023 
23-0388-EL-ACPRPS Report for ENGIE Power & Gas LLC04/14/2023 
23-0389-EL-ACP2022 RPS Filing for Champion Energy Services, LLC04/12/2023 
23-0390-EL-ACP2022 RPS Report for North American Power and Gas, LLC04/12/2023 
23-0391-EL-ACPIn the Matter of the Alternative Energy Portfolio Status Report for Calendar Year 2022 from MidAmerican Energy Services, LLC04/12/2023 
23-0392-EL-ACPAP Gas & Electric (OH), LLC RPS Report for 202204/13/2023 
23-0393-EL-ACPCalendar Year 2022 RPS Compliance Filing Report for SunSea Energy OH, LLC.04/13/2023 
23-0394-EL-ACPIn the Matter of the RPS Report for the 2022 Compliance Year of Public Power, LLC04/14/2023 
23-0395-EL-ACPIn the Matter of the RPS Report for the 2022 Compliance Year of Viridian Energy Ohio LLC04/14/2023 
23-0396-EL-ACPIn the Matter of the RPS Report for the 2022 Compliance Year of Viridian Energy PA, LLC04/14/2023 
23-0397-EL-ACPKiwi Energy RPS RY202204/13/2023 
23-0399-EL-ACPClearview Electric Inc. 2022 RPS Compliance Report04/13/2023 
23-0401-EL-ACPDiscount Power, Inc 2022 RPS Compliance Filing04/13/2023 
23-0403-EL-ACPTalen Energy Marketing, LLC's Annual Compliance Filing04/17/2023 
23-0404-EL-ACPCPV Retail Energy LP Renewable Portfolio Standard 2022 Compliance Filing Report 04/14/2023 
23-0405-EL-ACPIn the Matter of RPS Report for the 2022 Compliance Year of Ambit Northeast, LLC04/14/2023 
23-0406-EL-ACPIn the Matter of the RPS Report for the 2022 Compliance Year of Dynegy Energy Services (East), LLC04/14/2023 
23-0408-EL-ACPIn the Matter of the RPS Report for the 2022 Compliance Year of Energy Services Providers, Inc.04/14/2023 
23-0412-EL-ACPIn the Matter of the Annual Renewable Energy Status Report of Ohio Edison Company, The Cleveland Electric Illuminating Company, and The Toledo Edison 04/14/2023 
23-0413-EL-ACPBP Energy Holding Company LLC RPS Annual Filing 202204/14/2023 
23-0415-EL-ACPSmartEnergy Holdings, LLC OH RPS 2022 Compliance Filing04/14/2023 
23-0417-EL-ACPAEP Energy Inc. Annual RPS Compliance Filing 2022 Compliance Year04/14/2023 
23-0422-EL-ACPEnPowered USA Inc. RPS Compliance Report (2018-2022)04/14/2023 
23-0423-EL-ACPOhio Power Company 04/14/2023 
23-0424-EL-ACPOhio Power Company 04/14/2023 
23-0425-EL-ACPOhio Power Company 04/14/2023 
23-0426-EL-ACPIn the Matter of the RPS Report for the 2022 Compliance Year of TriEagle Energy, LP04/14/2023 
23-0427-EL-ACPIn the Matter of the RPS Report for the 2021 Compliance Year of Everyday Energy, LLC04/14/2023 
23-0428-EL-ACPIn the Matter of the RPS Report for the 2022 Compliance Year of Everyday Energy, LLC04/14/2023 
23-0429-EL-ACPConstellation NewEnergy, Inc. Annual RPS Report for Compliance Year 202204/17/2023 
23-0430-EL-ACPPowervine Energy, LLC Annual RPS Compliance04/14/2023 
23-0431-EL-RPTSantanna Natural Gas Corporation and Santanna Energy Services RPS Compliance Filing CY 202204/14/2023 
23-0432-EL-ACPApplication In the Matter of the RPS Compliance Report 2022 Compliance Year for MP2 Energy NE LLC04/17/2023 
23-0433-EL-RDRIn the Matter of the Application of Ohio Power Company to Update its Storm Damage Recovery Rider Rates04/17/2023 
23-0434-EL-ACPAmerican PowerNet Management LP 2022 RPS04/17/2023 
23-0435-EL-ACPAPN Starfirst LP Annual RPS Compliance Filing Report for 202204/17/2023 
23-0438-EL-AISIn the Matter of the Application of The Cleveland Electric Illuminating Company for Authority to Issue, Sell, or Enter into Debt Transactions05/02/2023 
23-0439-EL-AISIn the Matter of the Application of Ohio Edison Company for Authority to Issue, Sell, or Enter into Debt Transactions05/02/2023 
23-0451-EL-ACPFirst Point Power 2022 Report05/03/2023 
23-0453-EL-RDRDuke Energy Ohio, Inc. Rider LGR Update05/30/2023 
23-0454-EL-USFDuke Energy Ohio, Inc. Rider USF04/20/2023 
23-0455-EL-UEXDuke Energy Ohio, Inc. Rider UE-ED06/30/2023 
23-0456-EL-UEXDuke Energy Ohio, Inc. Rider UE-GEN06/30/2023 
23-0457-EL-RDRDuke Energy Ohio, Inc. Rider BTR07/14/2023 
23-0458-EL-UNCDuke Energy Ohio, Inc. Nonpayment Service Disconnections Annual Report04/20/2023 
23-0459-EL-BGAIn the Matter of the Application of Grover Hill Wind, LLC to Amend its Certificate Issued in Case No. 20-417-EL-BGN.05/03/2023 
23-0462-EL-BLNLeroy Center-Mayfield Q3 and Q4 138kV Transmission Lines Reconductor Project06/16/2023 
23-0467-EL-AGGOptics Consulting, LLC04/25/2023 
23-0468-EL-CSSGreg Graham against Energy Harbor, LLC aka FirstEnergy Solutions04/25/202302/08/2024
23-0473-EL-RDRDayton Power and Light dba AES Ohio05/26/2023 
23-0474-EL-BLNSouth Canton - Sunnyside 138 kV Transmission Line Project05/11/2023 
23-0475-EL-BLNSouth Canton - Torrey 138 kV Transmission Line Project05/11/2023 
23-0477-EL-RDRThe Dayton Power and Light Company d/b/a AES Ohio - Infrastructure Investment Rider05/02/2023 
23-0478-EL-ATAOhio Edison Company, The Cleveland Electric Illuminating, The Toledo Edison Company04/27/2023 
23-0482-EL-RDRIn the Matter the Generation Energy and Generation Capacity riders for Ohio Power Company04/27/2023 
23-0483-EL-BNRHighland-Magellan No. 1 138 kV Structure Relocation Project05/16/2023 
23-0484-EL-RDRIn the Matter of the Application of Ohio Power to Update its gridSMART Rider Rates 04/28/2023 
23-0489-EL-CSSANTHONY L TOWNES VS OHIO EDISON COMPANY 05/01/2023 
23-0492-EL-BTASecond Amendment to the Pine Ridge-Heppner 138 kV Transmission Line05/17/2023 
23-0495-EL-BTXMC Squared Energy Services, LLC05/02/2023 
23-0500-EL-FOROHIO VALLEY ELECTRIC CORPORATION01/03/2023 
23-0501-EL-FORAEP OHIO (OHIO POWER COMPANY)01/03/2023 
23-0502-EL-ESSOhio Power Company 05/05/2023 
23-0503-EL-FORDUKE ENERGY OHIO CORPORATION01/03/2023 
23-0504-EL-FORFIRSTENERGY CORPORATION (OHIO EDISON COMPANY, THE CLEVELAND ELECTRIC ILLUMINATING COMPANY, THE TOLEDO EDISON COMPANY)01/03/2023 
23-0505-EL-FORDAYTON POWER AND LIGHT COMPANY01/03/2023 
23-0506-EL-ACPPlanet Energy RPS Compliance Report05/08/202312/26/2023
23-0516-EL-CSSDarla Arlene Lynch vs AEP Ohio05/05/2023 
23-0526-EL-AGGkWhours LLC05/05/2023 
23-0527-EL-ACPAnnual Adjustment of the Alternative Compliance Payment for 2023, Pursuant to 4928.64(C)(2)(b), Revised Code05/08/2023 
23-0528-EL-BLNHayden – Roberts 345 kV Transmission Line Cut-ins to Cosgray Station (Adjustments) Project05/09/2023 
23-0531-EL-BLNJerome 138 kV Station Project05/11/2023 
23-0535-EL-UNC In the Matter of the Application of Ohio Power Company for Administration of the Significantly Excessive Earnings Test for 202205/12/2023 
23-0536-EL-CRSIn the Matter of the Application of Papillon Productions, LLC05/10/2023 
23-0538-EL-BNRKammer – Dumont 765kV Transmission Line Raise05/31/2023 
23-0540-EL-CSSROBERT BUSEK / DIGITAL ONE VS CLEVELAND ELECTRIC ILLUMINATING COMPANY THE ( AKA THE ILLUMINATING COMPANY )05/11/2023 
23-0541-EL-CSSDORSEY H. THOMPSON VS IGS ENERGY INC. 05/11/202302/08/2024
23-0543-EL-UNCThe Dayton Power and Light Company d/b/a AES Ohio05/15/2023 
23-0545-EL-UNCOhio Edison Company, The Cleveland Electric Illuminating Company and The Toledo Edison Company05/15/2023 
23-0546-EL-AECIn the Matter of the Application for Establishment of a Reasonable Arrangement Between Arkon Energy USA, LLC and Ohio Power Company05/15/2023 
23-0547-EL-CSSSHANE AND EMILY KRAMER VS IGS ENERGY 05/15/2023 
23-0549-EL-RDRIN THE MATTER OF THE ANNUAL REVIEW OF DUKE ENERGY OHIO, INC.’S DISTRIBUTION CAPITAL INVESTMENT RIDER06/14/2023 
23-0556-EL-RDRApplication of Duke Energy Ohio, Inc., for Authority to Adjust its Power Future Initiatives Rider05/16/2023 
23-0557-EL-BLNIn the Matter of the Letter of Notification Application of Cadence Solar Energy LLC to Construct the Cadence Solar Energy Center Transmission Line.05/18/2023 
23-0558-EL-BNRF7481 Phase 206/15/2023 
23-0559-EL-CSSMiami Athletic Club, Inc. against AEP Energy Inc.05/17/202302/08/2024
23-0563-EL-ABNIn the Matter of the Application of Ohio Power for Authority to Abandon Service.05/19/2023 
23-0564-EL-BNRHillsboro-Millbrook Park 138 kV Line Adjustment 2 Project05/19/2023 
23-0569-EL-BNRHedding Road-Morrow Co-op 138 kV Transmission Line Relocation Project06/01/2023 
23-0570-EL-BLNHedding Road Switch and West Mount Vernon-North Waldo 138 kV Relocation Project06/01/2023 
23-0576-EL-BNRSouth Point – Portsmouth 138-kV Transmission Line Tie-in Project05/23/2023 
23-0579-EL-GAGCity of Lima (Allen County)05/23/2023 
23-0583-EL-BLNSpickard Station and Hillsboro-Clinton 138 kV Cut-in Project07/18/2023 
23-0584-EL-BNRSpickard-Dodson Creek Solar 138 kV Generation Tie Line Project07/20/2023 
23-0589-EL-ATAOhio Edison - Pole Attachment Tariff Update12/21/2023 
23-0590-EL-ATACleveland Electric Illuminating Company - Pole Attachment Tariff Update12/21/2023 
23-0591-EL-ATAToledo Edison - Pole Attachment Tariff Update12/21/2023 
23-0598-EL-CSSBenjamin Florkey against AES Ohio05/26/2023 
23-0601-EL-UNCIn the Matter of SmartEnergy Holdings, LLC05/30/2023 
23-0603-EL-USFApplication of the Ohio Development Services Agency for an Order Approving Adjustments to the Universal Service Fund Riders05/31/2023 
23-0611-EL-BNRSidney-Franklin 138kV Transmission Line Adjustment Project- AES Ohio06/09/2023 
23-0612-EL-CRSCRES Application - AES Solutions Management05/31/2023 
23-0631-EL-BLNAnguin 138 kV Extension No. 2 and No. 3 Transmission Line Project 06/08/2023 
23-0632-EL-BNRAnguin - Babbitt 138 kV Transmission Line Adjustment Project06/08/2023 
23-0643-EL-BTAAmendment to the Groves Road-Shannon 138 kV Transmission Line Project06/12/2023 
23-0646-EL-BNRBuckeye Co-Op Extension Fayette 138kV Pole Installation Adjustment Project06/07/2023 
23-0648-EL-BTXPhilo Newcomerstown 138 kV Transmission Line Project (East New Concord Switch - Norfield Switch)07/18/2023 
23-0650-EL-BTAIn the Matter of the Application of Firelands Wind, LLC to Amend/Modify its Certificate Issued in Case No. 19-1073-EL-BTX.07/06/2023 
23-0651-EL-GAGCity of Middletown07/07/2023 
23-0653-EL-GAGCity of South Lebanon07/07/2023 
23-0656-EL-BLNWest Dover 138 kV Transmission Line Relocations Project06/14/2023 
23-0657-EL-BLNBeacon Station Project 06/09/2023 
23-0669-EL-GAGBridge Energy Services LLC (CRES) Governmental Aggregator Application06/23/2023 
23-0677-EL-CSSMark W Bellamy vs AEP Ohio06/15/2023 
23-0688-EL-BLNGreen Chapel Extension 138 kV Transmission Line Project 07/11/2023 
23-0691-EL-BLNBEACON STATION PROJECT06/22/2023 
23-0694-EL-BNRSpeidel-Barnesville 138 kV Cut-in to Pumpkin Station Project06/28/2023 
23-0695-EL-AGGCHAUTAUQUA ENERGY MANAGEMENT INC06/23/2023 
23-0696-EL-CSSEtta Hughes / Brenda Jennings vs AES Ohio06/26/2023 
23-0705-EL-BNRHartman Farms 138 kV Extension No. 6 Transmission Line Project (Phase 2)06/29/2023 
23-0710-EL-AGGCompetitive Retail Electric Service (CRES) Provider Application06/28/2023 
23-0713-EL-BGNIn the Matter of the Application of Mink Solar LLC for a Certificate of Environmental Compatibility and Public Need to Construct a Solar-Powered Elect07/05/2023 
23-0714-EL-PEBDuke Energy Ohio, Inc.12/07/2023 
23-0727-EL-GAGCity of Hillsboro07/06/2023 
23-0737-EL-CRSAEP Energy Partners, Inc07/07/2023 
23-0750-EL-AGGLiberty Ventures07/14/2023 
23-0757-EL-BLNLetter of Notification of Clean Energy Future – Trumbull, LLC for the Trumbull Energy Center Electrical Interconnection 07/18/2023 
23-0759-EL-GAGWashington County07/19/2023 
23-0771-EL-CSSCLIFFORD L. RUCKER VS DUKE ENERGY 07/24/2023 
23-0779-EL-UNCIn the Matter of the Application of the Ohio Department of Development to Adjust Ohio Power Company’s 2023 Universal Service Fund Rider Rate07/25/2023 
23-0781-EL-UNCIn the Matter of the Proposed Modifications to the Electric Distribution Utilities’ Standard Service Offer Procurement Auctions.07/26/2023 
23-0785-EL-BNRBeaver-Black River 138 kV Transmission Line Tap to Serve AMPT Project08/22/2023 
23-0793-EL-RDRIn the Matter of the Application of Ohio Power Company to Adjust the Economic Development Cost Recovery Rider Rate. 07/31/2023 
23-0795-EL-BNRCosgray-Rivendell No. 1 and No. 2 345 kV Tie Lines Project08/01/2023 
23-0796-EL-BGNIn the Matter of the Application of Frasier Solar, LLC for a Certificate of Environmental Compatibility and Public Need08/09/2023 
23-0797-EL-BLNCyprus 138 / 345 kV Station Expansion Project08/03/2023 
23-0798-EL-AECIn the Matter of the Application for Establishment of a Reasonable Arrangement Between the City of Akron and Ohio Edison Company.08/17/2023 
23-0802-EL-AGGPower 2 Profit Energy Solutions Inc08/08/2023 
23-0804-EL-AECThe Dayton Power and Light Company dba AES Ohio08/10/2023 
23-0812-EL-BNRBrookside-Henrietta 138 kV Transmission Line Switch Replacement Project08/14/2023 
23-0813-EL-CSSPATRICIA SHAFFER VS A.E.P08/14/2023 
23-0818-EL-RDRThe Dayton Power and Light Company d/b/a AES Ohio - Distribution Investment Rider08/17/2023 
23-0819-EL-RENKalmbach REK Solar08/16/2023 
23-0821-EL-BNRDuke Energy Ohio, Inc. OPSB Aicholtz Pole Relocation08/17/2023 
23-0823-EL-WVRIn the Matter of the Application of Duke Energy, Ohio, Inc. for Continuation of Waiver11/17/2023 
23-0826-EL-PEBDuke Energy Ohio, Inc.10/06/202303/12/2024
23-0828-EL-CSSSimon & Tiffany Demmons vs AES Ohio08/21/2023 
23-0829-EL-BNRBroadview – Tangy 138 kV Transmission Line Switch Replacement Project09/07/2023 
23-0830-EL-EDIAdoption of Electronic Data Interchange Standards and Uniform Business Practices for the Electric Industry08/24/2023 
23-0832-EL-CSSMs. Saabirah Desai vs AEP08/23/2023 
23-0836-EL-BLNHuntley 138 kV Extension Cut-in, Scherers Switch, and Scherers Switch-Alexander 138 kV Transmission Line Project 08/29/2023 
23-0839-EL-RENIndependence Wind Farm08/25/2023 
23-0844-EL-BTAAmendment to the Wood County 138 kV Reinforcement Project09/26/2023 
23-0846-EL-ATAIn the Matter of the Application of Duke Energy Ohio, Inc. for Rider LM & TD Update09/06/2023 
23-0847-EL-AGGAGR GROUP NEVADA LLC09/01/2023 
23-0848-EL-RDRDayton Power and Light Company - Authority to Recover Certain Storm-Related Service Restoration Costs09/06/2023 
23-0850-EL-BLNPoth Extension East and West 138 kV Transmission Line Project09/15/2023 
23-0851-EL-BNRE. Broad St. – Bexley 138 kV Transmission Line Cut-In Project09/19/2023 
23-0852-EL-BNRJug Street – Corridor 345 kV Transmission Line Cut-in to Badger Station Project09/13/2023 
23-0855-EL-BLNMadison to Fayette 345 kV Transmission Line Adjustment Project (South Section)09/11/2023 
23-0857-EL-AGGArbor Energy Brokerage Services LLC Application for Aggregator and Power Broker Certificate09/08/2023 
23-0858-EL-AECIn the Matter of the Joint Application of Amazon Data Services, Inc. and Ohio Power Company for Approval of a Reasonable Arrangement11/14/2023 
23-0859-EL-ATAIn the Matter of the Application of Ohio Edison Company, The Cleveland Electric Illuminating Company, and The Toledo Edison Company for Approval of Ta09/11/2023 
23-0864-EL-ATAIn the Matter of the Application of Duke Energy Ohio, Inc. for Authority to Adjust its Green Power / Carbon Offset Rider10/06/2023 
23-0866-EL-AECIn the Matter of the Application for Establishment of a Reasonable Arrangement Between Crown56, LLC and Ohio Power Company 09/13/2023 
23-0867-EL-UNCDuke Energy Ohio, Inc.09/29/2023 
23-0869-EL-AISThe Dayton Power and Light Company d/b/a AES Ohio09/15/2023 
23-0872-EL-BNRATSI’s Sammis Star 345kV Transmission Line and Sammis Wellsville 345kV Transmission Line Structure Replacement Project10/04/2023 
23-0881-EL-AGGNational Auditing Services & Consulting LLC d/b/a National Auditing Services09/22/2023 
23-0883-EL-AISAEP Ohio Transmission Company, Inc. Application for Authority to Issue Long-Term Debt09/22/2023 
23-0884-EL-AISAEP Ohio Transmission Company, Inc. Application for Authority to Issue Short-Term Debt09/22/2023 
23-0886-EL-BNRChrysler-Maclean 138 kV Transmission Line Tap to First Solar PGT-4 Substation Project. 10/23/2023 
23-0887-EL-BNRSouth Canton – West Canton 138kV Transmission Line Cut-In (Reedurban) Project09/25/2023 
23-0890-EL-BTXWest Watertown - Watertown 138 kV Transmission Line Project10/03/2023 
23-0891-EL-AECIn the Matter of the Application of Ohio Power Company and New Albany Data Center, LLC for Approval of a Reasonable Arrangement Under R.C. 4905.31 and09/28/2023 
23-0893-EL-RDRIn the Matter of the 2023 Review of the Delivery Capital Recovery Rider of Ohio Edison Company, the Cleveland Electric Illuminating Company, and the T10/27/2023 
23-0898-EL-UNCIn the Matter of the Application of Ohio Edison Company, The Cleveland Electric Illuminating Company, and the Toledo Edison Company for Approval of a 09/27/2023 
23-0900-EL-AGGBCG Consulting Group LLC Application for Power Broker Certificate09/27/2023 
23-0902-EL-CSSBarry Williams vs Ohio Edison (Case No.ID 00829223)09/27/2023 
23-0903-EL-RENPrevailing Wind Park09/27/2023 
23-0904-EL-RENCrow Lake Wind Farm09/27/2023 
23-0905-EL-RENPrairiewinds ND109/27/2023 
23-0906-EL-GAGRiley Township, Sandusky Co.09/28/2023 
23-0909-EL-BLNNew Camp Washington Substation and Transmission Line Installation 12/18/2023 
23-0913-EL-RDROhio Edison Company10/02/2023 
23-0914-EL-RDRThe Cleveland Electric Illuminating Company10/02/2023 
23-0915-EL-RDRThe Toledo Edison Company10/02/2023 
23-0918-EL-CSSSpectrum Mid-America, LLC v. Ohio Power Company10/02/2023 
23-0919-EL-BNRHarrison Extension 138 kV Pole Replacement Project10/05/2023 
23-0920-EL-BNRThree Creeks 138 kV Switch Bypass Pole Project10/02/2023 
23-0921-EL-CSSBrandon Shelt vs First Energy Corp (The Illuminating Company)10/03/2023 
23-0922-EL-CSSDebra L. Clark vs The Illuminating Co. / NOPEC/ IGS10/03/2023 
23-0923-EL-UNCIn the Matter of the Procurement of Standard Service Offer Generation for Customers of The Dayton Power and Light Company d/b/a AES Ohio.10/03/2023 
23-0925-EL-UNCIn the Matter of the Application of Ohio Power Company for Approval of in Bill Format10/03/2023 
23-0926-EL-RDRIn the Matter of the Quarterly Reports of Rider DCI Schedules for Duke Energy Ohio, Inc. 11/03/2023 
23-0927-EL-ACELall Solar10/03/2023 
23-0928-EL-ACPGreenLight, Inc. 2021 OH RPS Compliance10/04/2023 
23-0930-EL-BGNIn the Matter of the Application of Richwood Solar, LLC for a Certificate of Environmental Compatibility and Public Need to Construct a Solar-Powered 10/05/2023 
23-0931-EL-BGNIn the Matter of the Application of Stark Solar, LLC for a Certificate of Environmental Compatibility and Public Need to Construct a Solar-Powered Ele11/14/2023 
23-0935-EL-AGGStanwich Energy Advisors LLC10/06/2023 
23-0936-EL-BGAOregon Clean Energy Future-Oregon, LLC for a Third Amendment to its Certificate10/20/2023 
23-0937-EL-BNRAnguin 138 kV Extension No. 1 (Phase 2) Transmission Line Project10/13/2023 
23-0938-EL-CSSVictor and Pamela Bando vs American Electric Power Ohio10/10/2023 
23-0939-EL-CSSVictor Bando vs American Electric Power (AEP)10/11/2023 
23-0940-EL-RDRDuke Energy Ohio, Inc. 11/30/2023 
23-0948-EL-AECIn the Matter of the Application for Establishment of a Reasonable Arrangement Between SAI US, Inc. and Ohio Power Company10/13/2023 
23-0951-EL-BNRAmerican Transmission Systems, Incorporated London-Tangy 138 kV Transmission Line Tap Project11/06/2023 
23-0952-EL-BNRAmerican Transmission Systems, Incorporated London-Tangy 138 kV Transmission Line Tap Project12/01/2023 
23-0953-EL-BLNAmerican Transmission Systems, Incorporated, Angola-Eber-Vulcan 138 kV Transmission Line Rebuild and Wentworth Substation Expansion Project 11/17/2023 
23-0956-EL-AISIn the Matter of the Application of Ohio Edison Company for Authority to Issue, Renew, or Assume Liability on Notes and Other Evidences of Indebtednes10/16/2023 
23-0957-EL-AISIn the Matter of the Application of The Cleveland Electric Illuminating Company for Authority to Issue, Renew, or Assume Liability on Notes and Other 10/23/2023 
23-0958-EL-AISIn the Matter of the Application of The Toledo Edison Company for Authority to Issue, Renew, or Assume Liability on Notes and Other Evidences of Indeb10/23/2023 
23-0959-EL-AISIn the Matter of the Application of American Transmission Systems, Incorporated for Authority to Issue, Renew, or Assume Liability on Notes and Other 10/23/2023 
23-0961-EL-BNRConesville-Corridor 345 kV Cut-in and Innovation-Mordor 138 kV Tie Lines #1 & #2 Project10/20/2023 
23-0963-EL-AISIn the Matter of the Application of Ohio Valley Electric Corporation for Authority to Issue Evidence of Short-Term Indebtedness10/24/2023 
23-0964-EL-PEBDuke Energy Ohio, Inc.10/17/2023 
23-0965-EL-BNRLemoyne-Midway 138 kV Tranmission Line Structure Addition Project11/02/2023 
23-0966-EL-AGGStanwich Energy Advisors10/17/2023 
23-0968-EL-CSSImperium Fitness LLC against Duke Energy Ohio 10/18/2023 
23-0969-EL-GAGMorrow County Commissioners10/18/2023 
23-0970-EL-BNRKileville-Shire No. 3 and No. 4 138 kV Tie Lines Project10/20/2023 
23-0976-EL-AGGFRONTIER ENERGY CONSULTANTS LLC10/23/2023 
23-0983-EL-ACPRPS Compliance Filing Report for the 2019 Compliance Year ResCom Energy LLC10/27/2023 
23-0984-EL-ACPRPS Compliance Filing Report for the 2020 Compliance Year ResCom Energy LLC10/27/2023 
23-0985-EL-BLNElk Extension North 138kV Line Adjustment Project12/06/2023 
23-0986-EL-BNRElk - Vinton 138kV Extension Project12/06/2023 
23-0988-EL-AGGLowerEbill LLC Application for Competitive Retail Electric Service (CRES) Provider10/26/2023 
23-0991-EL-AGGEIQhome, LLC Application for Competitive Retail Electric Service (CRES) Provider Certificate11/06/2023 
23-0992-EL-ESSAEP OHIO (OHIO POWER COMPANY)01/03/2023 
23-0993-EL-ESSFIRST ENERGY CORPORATION (OHIO EDISON COMPANY, THE CLEVELAND ELECTRIC ILLUMINATING COMPANY, THE TOLEDO EDISON COMPANY)01/03/2023 
23-0994-EL-ESSDUKE ENERGY OHIO INC01/03/2023 
23-0995-EL-ESSDAYTON POWER AND LIGHT COMPANY01/03/2023 
23-0996-EL-ESSAEP OHIO (OHIO POWER COMPANY)01/03/2023 
23-0997-EL-ESSFIRST ENERGY CORPORATION (OHIO EDISON COMPANY, THE CLEVELAND ELECTRIC ILLUMINATING COMPANY, THE TOLEDO EDISON COMPANY)01/03/2023 
23-0999-EL-ESSDUKE ENERGY OIHO INC01/03/2023 
23-1000-EL-ESSDAYTON POWER AND LIGHT COMPANY01/03/2023 
23-1001-EL-ESSOHIO VALLEY ELECTRIC CORPORATION01/03/2023 
23-1005-EL-AGGStanwich Energy Advisors10/30/2023 
23-1007-EL-RDROhio Edison Company, The Cleveland Electric Illuminating, The Toledo Edison Company10/30/2023 
23-1009-EL-BLNKileville-Jerome 138 kV Transmission Line Project11/01/2023 
23-1013-EL-BLNKnox-Nottingham 138 kV Transmission Line Rebuild Project - New Stacy BUC to Nottingham Sub Segment10/31/2023 
23-1016-EL-ESSIn the Matter of Ohio Edison Company, The Cleveland Electric Illuminating Company and The Toledo Edison Company's programs for inspection, maintenance11/02/2023 
23-1017-EL-RDRIn the Matter of the Commission’s Review of the Phase 3 GridSMART Project of Ohio Power Company.11/01/2023 
23-1021-EL-BNRWest Van Wert – Delphos Center 138kV Line Adjustment Project11/15/2023 
23-1023-EL-AGGChoose Energy, Inc.11/03/2023 
23-1025-EL-CSSRehina Savchuk VS Cleveland Electric Illuminating Co11/06/2023 
23-1027-EL-AGGWILLIAM C GOULECHE INC11/06/2023 
23-1031-EL-RDRIn the Matter of Updating the Solar Generation Fund Rider 11/13/2023 
23-1032-EL-CSSCincinnati Insurance Company and Dysinger Inc vs AES Ohio LLC11/09/2023 
23-1034-EL-RDRDayton Power and Light Co. dba AES Ohio11/27/2023 
23-1041-EL-RDRDuke Energy Ohio, Inc. Rider SGF Annual Filing11/15/2023 
23-1042-EL-RDRAES Ohio Solar Generation Fund Rider11/13/2023 
23-1044-EL-BLNWaverly – Lick 138 kV Transmission Line Relocation 11/13/2023 
23-1045-EL-BLNConesville-Corridor 345 kV Transmission Line Adjustment Project (Bermuda and Curley Stations)11/16/2023 
23-1046-EL-BNRBixby-Marion Road 138 kV Prop Pole Project11/17/2023 
23-1050-EL-BLNHayden-Roberts 345 kV Cut-in (Beacon Station) and Beacon-Darby 345 kV Tie Lines Project 11/15/2023 
23-1052-EL-RDROhio Edison Company, The Cleveland Electric Illuminating, The Toledo Edison Company11/15/2023 
23-1053-EL-BNRMount Perry 138 kV Extension Project12/06/2023 
23-1054-EL-BNRMount Perry 138 kV Switch Project12/06/2023 
23-1060-EL-ACPEcoPlus Power, LLC 2021 Ohio Alternative Energy Portfolio Standard Status Report11/17/2023 
23-1062-EL-GAGCity of Coshocton11/22/2023 
23-1066-EL-AGGStanwich Energy Advisors, LLC - CRES Application11/17/2023 
23-1067-EL-AGGStanwich Energy Advisors CRES Application 202311/20/2023 
23-1070-EL-RDROhio Edison Company, The Cleveland Electric Illuminating, The Toledo Edison Company12/01/2023 
23-1071-EL-RDROhio Edison Company, The Cleveland Electric Illuminating, The Toledo Edison Company12/01/2023 
23-1072-EL-RDROhio Edison Company, The Cleveland Electric Illuminating, The Toledo Edison Company12/01/2023 
23-1073-EL-RDROhio Edison Company, The Cleveland Electric Illuminating, The Toledo Edison Company12/01/2023 
23-1074-EL-RDROhio Edison Company, The Cleveland Electric Illuminating, The Toledo Edison Company12/01/2023 
23-1075-EL-RDROhio Edison Company, The Cleveland Electric Illuminating, The Toledo Edison Company12/01/2023 
23-1076-EL-RDROhio Edison Company, The Cleveland Electric Illuminating, The Toledo Edison Company12/01/2023 
23-1077-EL-RDROhio Edison Company, The Cleveland Electric Illuminating, The Toledo Edison Company12/01/2023 
23-1078-EL-CSSSherman C. Green vs American Electric Power Ohio11/21/2023 
23-1079-EL-CSSNathan E. Frey vs American Electric Power Ohio11/21/2023 
23-1088-EL-GAGVillage of Jacksonburg12/07/2023 
23-1089-EL-GAGReily Township, Butler County12/11/2023 
23-1090-EL-GAGOxford Township, Butler County12/13/2023 
23-1091-EL-GAGCity of Fairfield12/13/2023 
23-1093-EL-GAGVillage of Seven Mile11/27/2023 
23-1097-EL-UNCIn the Matter of the Procurement of Standard Service Offer Generation for Customers of Ohio Power Co.11/27/2023 
23-1098-EL-BLNCeltic 345 kV Station Project12/11/2023 
23-1100-EL-RDRDuke Energy Ohio, Inc. Rider LGR Update12/01/2023 
23-1102-EL-CSSFredrick Vonderhaar Vs Duke Energy Corporation11/30/2023 
23-1106-EL-RDRIN THE MATTER OF THE ANNUAL REVIEW OF THE DISTRIBUTION INVESTMENT RIDER CONTAINED IN THE TARIFF OF THE DAYTON POWER AND LIGHT COMPANY d/b/a AES OHIO12/01/2023 
23-1107-EL-GAGVillage of Fairfax12/19/2023 
23-1109-EL-GAGCity of Grandview Heights12/04/2023 
23-1110-EL-GAGHarrison Township, Montgomery County12/27/2023 
23-1112-EL-GAGVillage of Lincoln Heights12/04/2023 
23-1113-EL-GAGVillage of Mariemont12/04/2023 
23-1117-EL-GAGMilford Township, Butler County12/20/2023 
23-1118-EL-GAGRoss Township, Butler County12/27/2023 
23-1120-EL-GAGWayne Township, Butler County12/19/2023 
23-1132-EL-RDROhio Power Company’s Distribution Investment Rider Work Plan.12/11/2023 
23-1133-EL-BNRAnguin 138 kV Extension No. 5 Transmission Line Project12/13/2023 
23-1134-EL-RENWhite Cloud Wind Project12/13/2023 
23-1135-EL-BTAIn the Matter of the Application of Grover Hill Wind, LLC to Amend its Certificate Issued in Case No. 22-269-EL-BTX12/21/2023 
23-1138-EL-ACPRenewable Portfolio Standard Report to the General Assembly for the 2022 Compliance Year12/14/2023 
23-1141-EL-CSSHubbard Township Board of Trustees vs. Ohio Edison / FirstEnergy12/15/2023 
23-1142-EL-CSSRobert Lane vs Duke Energy 12/15/2023 
23-1143-EL-WVRTHE DAYTON POWER AND LIGHT COMPANY D/B/A AES OHIO12/15/2023 
23-1145-EL-AGGF & D Partners Inc12/20/2023 
23-1173-EL-ACPDiamond Energy East, LLC 2023 RPS Compliance Report 12/28/2023 
23-1175-EL-CSSMichael Jansing vs Duke Energy12/29/2023 
23-1176-EL-RDRThe Dayton Power and Light Company d/b/a AES Ohio - DIR Work Plan 202412/29/2023 
23-1501-EL-FORAEP OHIO TRANSCO01/03/2023 
23-7000-EL-FADARCHIVE COMMISSION DOCUMENTS/ELECTRIC01/03/2023